Back to All Projectssite prep.set up site.excavation begins.excavation begins.Structural steel underway.Structural steel underway.Structural steel underway.Structural steel underway.A thermal insulation block provides a thermal break and ensures the cold is not transferred to the steel envelope.Talk Panel delivery today means we can begin closing in the structure.We will be using a suction lift to raise these large exterior IMP's. IMP raising pics coming soon!IMP install underway using the suction hoist.This machine provides increased efficiency and greater installer safety.Concrete trucks pumping concrete into the new freezer. Finished slab will be poured on top of mud slab.Crews finishing the fresh concrete. Flat finish must be achieved in order to maximize the efficiency of the MHE.The slab will now cure for 14 days before we go begin the temperature pull down.